Live job session
Job lifecycle
- ○ Dispatched
- ○ Arrived on-site
- ○ Work started
- ○ Work completed
- ○ Departure logged
Travel
—
Labour
—
DecibelCore™ · acoustic / vibration test
Relative digital level, not calibrated dB SPL. Phone gain and room noise affect readings.
Sound alone does not confirm a fault. Keep clear of moving equipment.
Photo Wire
Originals retained · attachment time uses the device clock · GPS recorded when available.
New readings and photographs are kept on device when you save the dossier.
Checking engineering access…
F-Gas compliance · add a charge, recovery or inspection
F-Gas compliance record
Charge and recovery masses must be verified by weighing or documented equipment records, never inferred from pressure or worn text.
Tonnes CO₂e
0.000
GWP
1387
Routine F-Gas check exempt
No GB routine interval established · Due not established
For guidance and logging assistance only. The inspecting engineer and operating company remain solely responsible for statutory UK compliance, physical testing, and record accuracy.
Saved jobs
No stock loaded. Columns: location, part_number, qty.
VanguardRadar™
Connect and select your company to verify access.
Account & company